Residential
Meeting Your Highest Standards for Sprinkler Applications
Process Checklist
In order to provide timely and efficient service, the checklist below indicates our typical design inputs and requirements at the three stages of deliverables: Design Stage / Rough-in Field Reviews / Final Sign-off.
Design
Rough-in Field Review
Final Sign-off
Sureworks Deliverables
Quote/Estimate/Standard Pricing
Schedule B (per BCBC/VBBL)
Ceritifcate Insurance
Insurance forms required by the city as required
Preliminary Drawing for Review
Sealed Sprinkler Drawings/Calcs for submission to AHJ/contruction
Invoice to client
Field Reviews as required
Advise of deficiencies-expected remedies
Sealed Rough-in Letter(s)
Final Field-Review as required
Schedule C-B (per BCBC/VBBL)
Record Drawings (if requested)
Client Documents/Inputs
Written project go-ahead
Contact/Invoicing Instructions
Project Description - note any special applications
Confirmation of applicable year of BCBC or VBBL (per building permit)
Confirmed Project Address
Municipality (AHJ)
Construction Phasing/Schedule
Water Supply Information if available
Drawings (both .pdf & .dwg formats)
-Architectural (full set)
-Civil (for Water Service)
-Structural (for attic framing, foundations, slabs, seismic parameters, etc.)
-Mechanical (for HVAC ducting, domestic water take-off, etc.)
1 week notice when ready for field review(s)
Confirm following before calling for rough-in Field Review
-sprinkler heads are installed
-piping is visible (before drywalling)
-iso-board and/or foam insulation complete
-electrical wires are isolated from piping
Follow-up on deficiencies
1 week notice when ready for field review(s)
Formal request for Schedule C-B
Passed hydrostatic test passed
Alarm Verification Report
Intergrated System Testing Report (if required)
Contractor's Material and Test Report
Copy of Maintenance Manual
Final Payments
PROFESSIONAL
EXPERTLY DESIGNED
FOR
3
DECADES
EXPERIENCED
TRUSTED
Meeting your highest standards
Automatic fire sprinkler designs based on local bylaws, NFPA 13D/13R, and code consultant requirements; 
Full hydraulic calculations;
Optimized plans to keep installation costs down;
On-site field reviews;
Evaluation of water supplies from municipal water works with specifications of tanks and pumps as required;
Adherence to British Columbia construction project management protocols supported with all appropriate Letters of Assurance;
Provide on-going support to answer all questions arising during installation and from municipal officials;
Experienced AutoCAD design team;
Regularly provide quick turn-around times, with most plans ready for construction within a few days!
Request Quote
Fully engineered fire suppression systems based on local bylaws, property insurance stipulations, and industry standards including NFPA 13 as well as other NFPA and FMG standards;
Full hydraulic calculations;
Plans and calculations are optimized to minimize installation costs;
On-site field reviews;
Contact Us
Resources
Sprinkler Resources & Advocacy
Engineering / Professional
Municipalities
General Resources
Installation Examples